Skip to content

Septum + Theta Rhythm Phase 1 (Avenue 8)#131

Closed
TSchonleber wants to merge 1 commit into
mainfrom
septum-theta-phase-1
Closed

Septum + Theta Rhythm Phase 1 (Avenue 8)#131
TSchonleber wants to merge 1 commit into
mainfrom
septum-theta-phase-1

Conversation

@TSchonleber
Copy link
Copy Markdown
Owner

Operationalizes Avenue 8 from PR #125 research-avenues memo. Hippocampal theta pacemaker (4-8 Hz). 3 tables, 5 MCP tools, 9 tests. Manual tick advancement in Phase 1; Phase 2 daemon; Phase 3 phase-locked memory_search.

🤖 Generated with Claude Code

Hippocampal theta pacemaker (4-8 Hz). The cmd_search docstring
already mentions 'theta-gamma coupling' but there's no actual theta
clock. This adds one.

- Migration 076: 3 tables (septum_state, septum_ticks, septum_phase_locked_memories).
  Default theta_frequency_hz = 6.0 (middle of biological 4-8 Hz band).
  8 theta_bins per cycle (45deg each).
- 5 tools: status, tick, phase_lock, query_bin, set_frequency.
- 9 tests; all green.

Phase 2 = daemon-driven auto-ticking at theta_frequency_hz cadence.
Phase 3 = phase-locked memory_search restricted to current bin.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
@TSchonleber
Copy link
Copy Markdown
Owner Author

Superseded by #138 (brainctl-consolidation-v2), which already merged this work into main as part of the v2 tool surface consolidation. Closing as redundant.

@TSchonleber TSchonleber deleted the septum-theta-phase-1 branch May 21, 2026 08:15
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant