Add 4th (capex from estimate_cost) and 5th (ISO 2631 comfort score) objectives to the NSGA-II run. Surface a knee-point picker so the engineer doesn't have to read the whole front.
Tests: 5-obj front has >0 feasible solutions; knee-point is on the front; capex correlates with cable length.
Add 4th (capex from
estimate_cost) and 5th (ISO 2631 comfort score) objectives to the NSGA-II run. Surface a knee-point picker so the engineer doesn't have to read the whole front.Tests: 5-obj front has >0 feasible solutions; knee-point is on the front; capex correlates with cable length.