Skip to content

chore: add prism file #1230

chore: add prism file

chore: add prism file #1230

Triggered via push September 11, 2025 07:32
Status Failure
Total duration 45s
Artifacts
Matrix: Test
Slack notify on failure
0s
Slack notify on failure
Fit to window
Zoom out
Zoom in

Annotations

8 errors
Test (3.11)
Process completed with exit code 2.
Test (3.10)
Process completed with exit code 2.
Test (3.9)
The operation was canceled.
Test (3.9)
The strategy configuration was canceled because "test._3_10" failed
Test (3.12)
The operation was canceled.
Test (3.12)
The strategy configuration was canceled because "test._3_10" failed
Test (3.13)
The operation was canceled.
Test (3.13)
The strategy configuration was canceled because "test._3_10" failed