Skip to content

chore: use make test-integ #1236

chore: use make test-integ

chore: use make test-integ #1236

Triggered via push September 11, 2025 07:41
Status Failure
Total duration 1m 29s
Artifacts
Matrix: Test
Slack notify on failure
0s
Slack notify on failure
Fit to window
Zoom out
Zoom in

Annotations

9 errors
Test (3.9)
Process completed with exit code 2.
Test (3.11)
The operation was canceled.
Test (3.11)
The strategy configuration was canceled because "test._3_9" failed
Test (3.13)
The operation was canceled.
Test (3.13)
The strategy configuration was canceled because "test._3_9" failed
Test (3.10)
The operation was canceled.
Test (3.10)
The strategy configuration was canceled because "test._3_9" failed
Test (3.12)
The operation was canceled.
Test (3.12)
The strategy configuration was canceled because "test._3_9" failed