47e2f8b
Update hydro generation data and add Dunkel_test config
AbiAfthab Nov 7, 2025
3575a36
Add config.electricity.yaml in test1 branch
Hoshungshin Nov 4, 2025
1b2b35b
Add Dunkel_test.yaml in test1 branch
Hoshungshin Nov 4, 2025
bb5fc46
Changing location and minor fixes
lprieto1409 Nov 8, 2025
734e4f5
[pre-commit.ci] auto fixes from pre-commit.com hooks
pre-commit-ci[bot] Nov 8, 2025
a0f378d
Merge remote-tracking branch 'upstream/master'
Hoshungshin Dec 9, 2025
8b4dcf3
Add industry DSR (checkpoint profiles, stores, and configs)
aceccatoeurelectric Feb 9, 2026
ba82cfb
Fix industry DSR bugs and add missing retrieve rule
aceccatoeurelectric Feb 12, 2026
daa4364
Implement industry DSR v3: economically optional demand-side response
aceccatoeurelectric Feb 17, 2026
196ff87
Improve DSR dispatch plots: add price correlation and daily profiles
aceccatoeurelectric Feb 17, 2026
6dfd048
Fix solve_network.py: correct variable name and remove redundant coup…
aceccatoeurelectric Feb 24, 2026
38afb10
Refactor config: single source of truth in config.default.yaml with s…
aceccatoeurelectric Feb 24, 2026
81dbdad
Update DSR Impact Analysis notebook
aceccatoeurelectric Feb 24, 2026
5a9e251
testing_new_config
lprieto1409 Feb 25, 2026
0876546
testing_config
lprieto1409 Feb 25, 2026
7cfcfa7
Add baseline no-flexibility scenario config for EU 2030
aceccatoeurelectric Feb 25, 2026
bad2605
config: Move to scenario configs for flex and ref
euronion Feb 25, 2026
931a308
Merge branch 'industry-dsr-v3-optional' of https://github.com/AbiAfth…
euronion Feb 25, 2026
e746ebf
config: Remove old scenarios config
euronion Feb 25, 2026
45265ae
config: Rename config file to match convention
euronion Feb 25, 2026
d565054
config: Simplify scenarios (ref as default) and integrate Amedeo's co…
euronion Feb 25, 2026
3e4fea6
config: Further work-arounds for scenario management
euronion Feb 25, 2026
74d7a19
code: Update for countries and number of clusters
euronion Feb 25, 2026
89ff3a5
fixing marginal prices per country
lprieto1409 Feb 26, 2026
5bee4a0
marginal price per country
lprieto1409 Feb 26, 2026
62779fb
marginal price per country
lprieto1409 Feb 26, 2026
3346862
Add standalone flex configs for 2030, 2040, 2050
aceccatoeurelectric Feb 26, 2026
335cfb7
Adjust transport demand build logic and update plotting config
AbiAfthab Feb 26, 2026
b283cdf
fix time range for all configs
lprieto1409 Feb 27, 2026
cfa05f7
Merge remote-tracking branch 'origin/industry-dsr-v3-optional' into i…
AbiAfthab Feb 27, 2026
23a1c81
Update .gitignore
AbiAfthab Mar 1, 2026
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
13 changes: 13 additions & 0 deletions .gitignore
Original file line number Diff line number Diff line change
Expand Up @@ -56,6 +56,13 @@ dask-worker-space/
publications.jrc.ec.europa.eu/
d1gam3xoknrgr2.cloudfront.net/

# Ignore specific notebooks
PyPSA_Eurelectric_plot_helper.ipynb
pypsa_statistics.ipynb

# Ignore Windows metadata files
*.Zone.Identifier

*.org

*.nc
Expand All @@ -76,6 +83,12 @@ merger-todos.md

*.html

# analysis output
analysis_output/

# Windows WSL artifacts
*Zone.Identifier

# private dev folder
dev/*

Expand Down
1,115 changes: 1,115 additions & 0 deletions DSR_Impact_Analysis.ipynb

Large diffs are not rendered by default.

338 changes: 338 additions & 0 deletions DSR_V3_README.md
Original file line number Diff line number Diff line change
@@ -0,0 +1,338 @@
# DSR v3: Optional DSR with Economic Costs

## Overview

This branch (`industry-dsr-v3-optional`) implements **economically optional DSR** that allows the optimizer to decide whether building DSR capacity is cost-effective.

**Worktree location**: `~/.cursor/worktrees/pypsa-eurelectric__WSL__Ubuntu_/dsr-v3`

---

## Key Changes from v2

### 1. **DSR Capacity is Now Extendable** ✅

**Before (v2)**:
```python
e_nom=e_nom, # Fixed capacity - always built
# No e_nom_extendable
# No capital_cost
```

**After (v3)**:
```python
e_nom=0.0, # Start with 0
e_nom_extendable=True, # Let optimizer decide!
e_nom_max=e_nom, # Use calculated capacity as upper limit
capital_cost=store_capital_cost, # Add economic cost
```

**Impact**: Optimizer can now choose whether to build DSR based on cost-benefit analysis.

---

### 2. **Added Economic Parameters** 💰

New config parameters in `config/config.yaml`:

```yaml
industry:
dsr:
# DSR ECONOMIC PARAMETERS (NEW in v3)
store_capital_cost: 30.0 # EUR/MWh/year (energy capacity)
link_capital_cost: 0.0 # EUR/MW/year (power capacity)
charge_efficiency: 0.98 # 2% loss per direction
discharge_efficiency: 0.98
# Net roundtrip: 96.04%
```

**Rationale**:
- **30 EUR/MWh/year**: Conservative estimate for industrial DSR
- Control systems, sensors, scheduling software
- Process modifications if needed
- Amortized over lifetime
- **2% efficiency loss**: Represents opportunity costs of production scheduling
- **Link cost = 0**: Links are logical connections, minimal physical infrastructure

---

### 3. **Relaxed Checkpoint Frequency** ⏰

**Before (v2)**:
- Checkpoints at **6am AND 6pm** (twice daily)
- Only **12-hour shifting windows**
- 728 checkpoints per year

**After (v3)**:
- Checkpoints at **midnight only** (once daily)
- **24-hour shifting windows**
- 365 checkpoints per year

**Example**:
```yaml
"Iron & steel industry|Scrap-EAF": [0] # Daily checkpoint at midnight
# Instead of [6, 18]
```

**Benefits**:
- Better captures day/night price arbitrage
- More flexibility for load shifting
- Still ensures daily production completion
- Fewer forced cycling events

---

### 4. **Added Efficiency Losses** 📉

Links now have realistic efficiency parameters:

```python
n.add("Link", charge_links,
efficiency=0.98) # 2% loss when charging

n.add("Link", discharge_links,
efficiency=0.98) # 2% loss when discharging
```

**Roundtrip efficiency**: 0.98 × 0.98 = **96.04%**

This models the **opportunity costs** of production scheduling flexibility.

---

## How It Works

### Economic Optimization

The model now solves:

```
Minimize: system_cost + DSR_capital_cost + efficiency_losses

Subject to:
- All normal constraints (generation, transmission, etc.)
- DSR checkpoints (must return to 0 daily at midnight)
- DSR capacity limits: 0 ≤ e_nom_opt ≤ e_nom_max
```

**Decision**:
- If `arbitrage_value > (capital_cost + cycling_costs)` → Build DSR
- If `arbitrage_value < costs` → Build zero or minimal DSR
- Optimizer chooses optimal capacity between 0 and maximum

---

### Checkpoint Philosophy

**V3 maintains production discipline** while adding economic optionality:

1. **When DSR is built**: Checkpoints ensure daily production completion
2. **Economic optionality**: DSR is only built if cost-effective
3. **Operational flexibility**: 24-hour windows allow better arbitrage

**Key insight**: Hard checkpoints are OK because they represent **physical production constraints**. The issue wasn't checkpoints themselves, but that v2 **forced building** DSR capacity regardless of economics.

---

## Expected Results

### Scenario A: DSR is Economically Viable

If price volatility justifies DSR costs:

- ✅ **Lower system costs** (DSR provides arbitrage value > its costs)
- ✅ **Less peaking capacity** (OCGT, CCGT)
- ✅ **Lower average prices** (reduced capacity investment)
- ✅ **Higher DSR utilization** (>10-20% average fill level)
- ✅ **Reasonable DSR capacity** (optimizer builds optimal amount)

### Scenario B: DSR is NOT Economically Viable

If costs exceed benefits:

- ✅ **Zero or minimal DSR capacity** (optimizer chooses not to build)
- ✅ **Results similar to baseline** (no DSR impact)
- ✅ **This is OK!** Confirms DSR isn't cost-effective for these parameters

### Comparison to V2

| Metric | V2 (Mandatory) | V3 (Optional) |
|--------|----------------|---------------|
| **DSR Capacity** | 63.62 GWh (fixed) | 0 to 63.62 GWh (optimized) |
| **System Cost Change** | +3.02 B EUR ❌ | TBD (likely reduced or neutral) |
| **Price Change** | +3.74 EUR/MWh ❌ | TBD (likely reduced or neutral) |
| **DSR Utilization** | 1.9% (forced cycling) | TBD (efficient if built) |
| **Peaking Capacity** | +50 GW OCGT ❌ | TBD (likely less increase) |
| **Checkpoints** | 728/year (12h windows) | 365/year (24h windows) |

---

## Configuration File

**Location**: `~/.cursor/worktrees/pypsa-eurelectric__WSL__Ubuntu_/dsr-v3/config/config.yaml`

**Key settings**:
```yaml
run:
name: "EU_test_run_dsr_v3_optional"

industry:
dsr:
enable: true
store_capital_cost: 30.0 # Can adjust for sensitivity analysis
charge_efficiency: 0.98
discharge_efficiency: 0.98

restriction_time:
# All technologies: once-daily checkpoint at midnight
"Iron & steel industry|Scrap-EAF": [0]
# ... etc
```

---

## Running the Model

### Option 1: Quick Test (If Baseline Data Exists)

```bash
cd ~/.cursor/worktrees/pypsa-eurelectric__WSL__Ubuntu_/dsr-v3

# Run solve network only (if base network exists)
snakemake -call results/EU_test_run_dsr_v3_optional/networks/base_s_38___2030.nc \
--cores all --configfile config/config.yaml
```

### Option 2: Full Run

```bash
cd ~/.cursor/worktrees/pypsa-eurelectric__WSL__Ubuntu_/dsr-v3

# Full workflow
snakemake -call results/EU_test_run_dsr_v3_optional/networks/elec_s_38___2030.nc \
--cores all --configfile config/config.yaml
```

---

## Parameter Sensitivity Analysis

You can test different cost assumptions by modifying `config.yaml`:

### Conservative (High Cost) - Tests if DSR survives high costs:
```yaml
store_capital_cost: 50.0 # EUR/MWh/year
charge_efficiency: 0.95
discharge_efficiency: 0.95
```

### Aggressive (Low Cost) - Tests maximum DSR potential:
```yaml
store_capital_cost: 10.0 # EUR/MWh/year
charge_efficiency: 0.99
discharge_efficiency: 0.99
```

### Weekly Checkpoints - Tests longer shifting windows:
```yaml
restriction_time:
"Iron & steel industry|Scrap-EAF": [0] # Monday at midnight
# And change snapshots to weekly resolution (168h windows)
```

---

## Comparison Strategy

To validate v3 improvements, compare three runs:

1. **Baseline** (no DSR): `~/work/pypsa-eurelectric/results/EU_test_run`
2. **V2** (mandatory DSR): `~/.cursor/worktrees/kse/results/EU_test_run_dsr`
3. **V3** (optional DSR): `~/.cursor/worktrees/dsr-v3/results/EU_test_run_dsr_v3_optional`

**Key metrics**:
- System cost (objective value)
- DSR capacity built (e_nom_opt)
- DSR utilization (average fill %)
- Average electricity prices
- Peaking capacity (OCGT, CCGT)
- Total curtailment

**Expected outcome**:
- If v3 builds DSR: Cost should be lower than baseline (DSR is beneficial)
- If v3 doesn't build DSR: Cost should match baseline (DSR isn't beneficial)
- Either way: v3 should NOT be worse than baseline (unlike v2)

---

## Code Changes Summary

**Modified files**:
1. `config/config.yaml`:
- Changed run name to `EU_test_run_dsr_v3_optional`
- Added `store_capital_cost`, `link_capital_cost`, efficiencies
- Relaxed checkpoints from twice-daily to once-daily

2. `scripts/prepare_sector_network.py` (~line 5397-5448):
- Read economic parameters from config
- Set `e_nom=0.0` and `e_nom_extendable=True`
- Set `e_nom_max=e_nom` (calculated capacity as upper limit)
- Added `capital_cost` to stores
- Added `efficiency` and `capital_cost` to links

**No changes needed**:
- `scripts/solve_network.py` (redundant constraint already removed in v2)
- `scripts/build_industry_dsr_profile.py` (checkpoint generation works as-is)

---

## Debugging Tips

If v3 still shows issues:

1. **Check DSR capacity built**:
```python
dsr_stores = n.stores[n.stores.carrier == 'industry dsr']
print(f"Total capacity built: {dsr_stores.e_nom_opt.sum():.2f} MWh")
print(f"Max allowed: {dsr_stores.e_nom_max.sum():.2f} MWh")
```

2. **Check capital costs are applied**:
```python
print(f"Capital cost: {dsr_stores.capital_cost.mean():.2f} EUR/MWh/year")
```

3. **Check utilization**:
```python
fill_level = n.stores_t.e[dsr_stores.index].mean() / dsr_stores.e_nom_opt
print(f"Average fill: {fill_level.mean()*100:.1f}%")
```

4. **Compare to baseline**:
- If DSR capacity ≈ 0 → DSR isn't economic, which is OK
- If DSR capacity > 0 but costs still higher → Check if checkpoint constraints too tight

---

## Next Steps

1. ✅ Config updated with v3 parameters
2. ✅ Code updated in prepare_sector_network.py
3. ⏳ **Run the model** and check results
4. ⏳ **Compare** v3 vs v2 vs baseline
5. ⏳ If needed: **Sensitivity analysis** with different cost assumptions

---

## Branch Management

- **V2 branch** (current working): `industry-dsr-v2` in `~/.cursor/worktrees/kse`
- Keep as checkpoint - this is the "working but suboptimal" version

- **V3 branch** (improvements): `industry-dsr-v3-optional` in `~/.cursor/worktrees/dsr-v3`
- Test ground for optional DSR improvements

- **Baseline**: `master` branch in `~/work/pypsa-eurelectric`
- Reference for comparison

**Safe to experiment!** V2 is preserved if v3 doesn't work out.