Skip to content

8357141: Update to use jtreg 7.5.2#4350

Closed
GoeLin wants to merge 1 commit intoopenjdk:masterfrom
GoeLin:goetz_backport_8357141
Closed

8357141: Update to use jtreg 7.5.2#4350
GoeLin wants to merge 1 commit intoopenjdk:masterfrom
GoeLin:goetz_backport_8357141

Conversation

@GoeLin
Copy link
Copy Markdown
Member

@GoeLin GoeLin commented Apr 1, 2026

I would like to update the minimum jtreg in 17 to 7.5.2. This is the first step.

Based on change in 21.
Resolved two trivial conflicts.


Progress

  • Change must not contain extraneous whitespace
  • Commit message must refer to an issue
  • JDK-8357141 needs maintainer approval

Issue

  • JDK-8357141: Update to use jtreg 7.5.2 (Enhancement - P3 - Approved)

Reviewing

Using git

Checkout this PR locally:
$ git fetch https://git.openjdk.org/jdk17u-dev.git pull/4350/head:pull/4350
$ git checkout pull/4350

Update a local copy of the PR:
$ git checkout pull/4350
$ git pull https://git.openjdk.org/jdk17u-dev.git pull/4350/head

Using Skara CLI tools

Checkout this PR locally:
$ git pr checkout 4350

View PR using the GUI difftool:
$ git pr show -t 4350

Using diff file

Download this PR as a diff file:
https://git.openjdk.org/jdk17u-dev/pull/4350.diff

Using Webrev

Link to Webrev Comment

@bridgekeeper
Copy link
Copy Markdown

bridgekeeper bot commented Apr 1, 2026

👋 Welcome back goetz! A progress list of the required criteria for merging this PR into master will be added to the body of your pull request. There are additional pull request commands available for use with this pull request.

@openjdk
Copy link
Copy Markdown

openjdk bot commented Apr 1, 2026

@GoeLin This change now passes all automated pre-integration checks.

ℹ️ This project also has non-automated pre-integration requirements. Please see the file CONTRIBUTING.md for details.

After integration, the commit message for the final commit will be:

8357141: Update to use jtreg 7.5.2

You can use pull request commands such as /summary, /contributor and /issue to adjust it as needed.

At the time when this comment was updated there had been 7 new commits pushed to the master branch:

As there are no conflicts, your changes will automatically be rebased on top of these commits when integrating. If you prefer to avoid this automatic rebasing, please check the documentation for the /integrate command for further details.

➡️ To integrate this PR with the above commit message to the master branch, type /integrate in a new comment.

@openjdk openjdk bot changed the title backport 7540577aae9fa8ed04f981ccc1acbbf83ff2b5e1 8357141: Update to use jtreg 7.5.2 Apr 1, 2026
@openjdk
Copy link
Copy Markdown

openjdk bot commented Apr 1, 2026

This backport pull request has now been updated with issue from the original commit.

@openjdk openjdk bot added backport Port of a pull request already in a different code base clean Identical backport; no merge resolution required labels Apr 1, 2026
@openjdk
Copy link
Copy Markdown

openjdk bot commented Apr 1, 2026

⚠️ @GoeLin This change is now ready for you to apply for maintainer approval. This can be done directly in each associated issue or by using the /approval command.

@openjdk openjdk bot added the rfr Pull request is ready for review label Apr 1, 2026
@mlbridge
Copy link
Copy Markdown

mlbridge bot commented Apr 1, 2026

Webrevs

@openjdk openjdk bot added approval Requires approval; will be removed when approval is received ready Pull request is ready to be integrated and removed approval Requires approval; will be removed when approval is received labels Apr 2, 2026
@GoeLin
Copy link
Copy Markdown
Member Author

GoeLin commented Apr 8, 2026

/integrate

@openjdk
Copy link
Copy Markdown

openjdk bot commented Apr 8, 2026

Going to push as commit 9e6479d.
Since your change was applied there have been 10 commits pushed to the master branch:

Your commit was automatically rebased without conflicts.

@openjdk openjdk bot added the integrated Pull request has been integrated label Apr 8, 2026
@openjdk openjdk bot closed this Apr 8, 2026
@openjdk openjdk bot removed ready Pull request is ready to be integrated rfr Pull request is ready for review labels Apr 8, 2026
@openjdk
Copy link
Copy Markdown

openjdk bot commented Apr 8, 2026

@GoeLin Pushed as commit 9e6479d.

💡 You may see a message that your pull request was closed with unmerged commits. This can be safely ignored.

@GoeLin GoeLin deleted the goetz_backport_8357141 branch April 8, 2026 08:02
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

backport Port of a pull request already in a different code base clean Identical backport; no merge resolution required integrated Pull request has been integrated

Development

Successfully merging this pull request may close these issues.

1 participant